Insitu Concrete & Progressive Collapse

Product Demo

Here is the product demo for the Insitu Concrete & Progressive Collapse, which demonstrates how the product can be used in a step-by-step guide. Use the arrows to step through the demo.

DEMO COMING SOON

Previous Next

What is it?

BFL have built up a reputation over many years for setting the standard in the installation of progressive collapse details.

Key Benefits

About the Service

To comply with current building regulations, Class 2a, 2b and 3 structures must be designed and built with such robustness to protect against disproportionate collapse. To fulfil this requirement, many buildings need additional strengthening measures in the form of horizontal/vertical ties to anchor the floors to its supports.

We install all the extra tie/bar and steel requirements within the floor depth; we professionally shutter all columns, edge details and up-stands to give a smooth, exposed soffit finish.