This was a one-day project where we carried out finishing work to precast concrete dock levelling components, which were manufactured by FP McCann. They were working for main contractor GMI. The Beresford’s finishing team grouted the newly installed yard walls, pro-wall and yard wall lifting points, at this logistics and manufacturing hub in Bradford.
We were employed to carry out the installation of their precast dock levelling system. Beresford’s experienced dock levelling team installed 16 loads of precast concrete pro-wall panels and Stonehenge lintels. FP McCann’s client was main contractor Volker Fitzpatrick.
The setting out and installation of precast concrete dock levelling systems, is something we do best. This project was on behalf of FP McCann’s client, Readie Construction – and is the UK’s most integrated logistics hub. In four-days, our docks team completed the precast concrete pro-walls, lintels, Stonehenge columns, and the installation and grouting of the floor biscuit units.
Our first visit to Littlebrook Logistics Park in Dartford consisted of ten loads of precast concrete dock leveller components, which we installed over four days. This included the setting out, installation and grouting of 50 individual units – and 13 large insulated Prowall panels. This FP McCann project was on behalf of their client, Readie Construction.
We’re trusted by FP McCann – and some of the other big names in the industry – including Willmott Dixon, Galliford Try, Speller Metcalfe, Henry Brothers, Seddon, Wates, Kier, Coltman, Rhino and Forterra Building Products/Bison Precast.