We’re supporting our client and main contractor BAM by supplying and delivering the disproportionate collapse works for their Ridgewood School development in Doncaster. Once the hollowcore has gone down Beresford’s stitch the floors together with certified in-situ concrete, shuttering, and loose reinforcement, and install associated tie requirements to the supporting steel frame.
Main contractors usually bring us in early because we save them time and money when they use our simplified connection details between the interface of the steel frame and precast floors. Our details eliminate site welding (the tie details are still achieved), removing temporary soffit shuttering of the internal non-load bearing tie beams, and deliver a more attractive finish.
Beresford’s is a Constructionline Gold Member. Talk to us about your next project by calling 01335 345111 or emailing massmix@bfl.uk.com