The Moortown Group recommended us to Galliford Try for this project, when they were on site preparing the groundworks. After successfully quoting for the in-situ works, the Beresford’s team got started.
At Beresford’s, we provide three in-situ concrete works packages, and this is our Tier 3 option. It involves concreting between the precast flooring elements/joints, perimeter and bearing locations and includes loose reinforcement, perimeter and soffit shuttering.
Typically, this scope is linked to progressive/disproportionate collapse.
You can download our Tier 3 package here.
This is our fourth project for Galliford Try having successfully completed:
Our works at Broadmarsh Car Park was progressive collapse and precast grouting. This is what John McGovern, Senior Engineer at Galliford said about the project: Galliford Try.